QUALITY CONTROL
2020-07-29
Incoming material control:
Xinruida according as ISO2859 sampling SPEC
Function Test : C=0 , AQL=0.4
Appearance Test : L=II , AQL=1.5
Some special part do 100% inspection
Each project must do previous perpare
1,Part SOP,SIP CP checking ,perparing
2,Row material checking , perparing
3,PL,QA equipment, tools,checking
Normal / abnormal production dispose:
Xinruida each process must comply the
part SOP ,SIP ,The whole process must
comply project CP
Xinruida process abnormity must comply
abnormity production procedure
Xinruida shipment:
Xinruida according as ISO2859 sampling SPEC
Function Test : C=0, AQL=0.4
Appearance Test: L=II, AQL=1.0
After PL 100% inspection
Consider the part characteristic
Xinruida QA also will do 100% inspection